Mercom Insider

Odisha Regulator Allows Net Metering for Rooftop Solar Capacity up to 500 kW

Systems of 5 to 500 kW must be installed under group net metering or virtual net metering framework

thumbnail

Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights


The Odisha Electricity Regulatory Commission (OERC) has allowed a net metering facility for rooftop solar systems up to 500 kW or up to the sanctioned load, whichever is lower, as long as it is within 75% of the transformer capacity.

MERCOM Insider

Where clean energy's most influential leaders get their intelligence

Exclusive reporting, market intelligence, and insider access that shapes billion-dollar decisions in renewable energy and clean technology.

RELATED POSTS

Get the most relevant India solar and clean energy news.

RECENT POSTS