Solar EPCs Could Cut BoS Costs by Up to 12% Through Cable Optimization
Optimizing cable sizing, routing, and equipment placement can reduce costs, but developers must weigh upfront savings against long-term power losses
November 24, 2026
Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights
Solar engineering, procurement, and construction (EPC) companies are increasingly focusing on cable sizing and routing to reduce balance-of-system (BoS) costs while maintaining project performance and reliability.
