geoa
The Madhya Pradesh Electricity Regulatory Commission (MPERC) has issued a standard operating procedure (SOP) governing the banking of power by green energy open access...
Himachal Pradesh State Load Dispatch Centre (HPSLDC) has issued the draft procedure for the grant of short-term green energy open access (GEOA) through intrastate...
Consumers with a contracted or sanctioned load of 100 kW and above, including those combining multiple connections to reach 100 kW within the same electricity division...
1
...
1


